Proposed development for a Data Centre, Neath Port Talbot

We are pleased to announce that we will soon be submitting a planning application for a new Data Centre on the Land at Tyn-y-Caeau, which is located in Margam, Port Talbot, Neath Port Talbot SA13 2NW.

The Town and Country Planning (Development Management Procedure) [Wales] [Amendment] Order 2016 requires draft planning applications to be available for comments for a minimum period of 28 days before formal submission to the Local Planning Authority. We are now undertaking this on behalf of Caerphilly County Borough Council who will be the applicant for the proposed development. 

The usual planning consultation procedures will still be followed by the Planning Authority whilst determining the application. 

The draft planning application documents are therefore available to download from this page of our website. 

Should you wish to make any comments on the proposed application, please address them to:

[email protected] 

Or

The Urbanists, Westgate House, 11 Womanby Street, Cardiff, CF10 1BR by the 1st of March 2025.

 

Datblygiad arfaethedig ar gyfer Canolfan Ddata, Castell-nedd Port Talbot.

Mae’n bleser gennym gyhoeddi y byddwn yn cyflwyno cais cynllunio cyn bo hir ar gyfer Canolfan Ddata newydd ar y Tir yn Tyn-y-Caeau, sydd wedi’i lleoli ym Margam, Port Talbot, Castell-nedd Port Talbot SA13 2NW.

Mae Gorchymyn Cynllunio Gwlad a Thref (Gweithdrefn Rheoli Datblygu) [Cymru] [Diwygio] 2016 yn ei gwneud yn ofynnol i geisiadau cynllunio drafft fod ar gael ar gyfer sylwadau am o leiaf 28 diwrnod cyn eu cyflwyno’n ffurfiol i’r Awdurdod Cynllunio Lleol. Rydym nawr yn gwneud hyn ar ran Cyngor Bwrdeistref Sirol Caerffili, sef yr ymgeisydd ar gyfer y datblygiad arfaethedig.

Bydd y gweithdrefnau ymgynghori cynllunio arferol yn dal i gael eu dilyn gan yr Awdurdod Cynllunio wrth benderfynu ar y cais. 

Mae’r dogfennau cais cynllunio drafft felly ar gael i’w llwytho i lawr o’r dudalen hon o’n gwefan. 

Os hoffech wneud unrhyw sylwadau ar y cais arfaethedig, dylech eu cyfeirio at:

[email protected] 

Neu

The Urbanists, Westgate House, 11 Womanby Street, Caerdydd, CF10 1BR erbyn 01 Mawrth 2025.

(2024.09.03) 2335 Land at Tyn-y-Caeau, Margam
794-ENV-AIR-21341_ Air Quality Assessment_v1.1.pdf
17163_R01a_Landscape and Visual Appraisal_20250130_OK_AW_opt.pdf
17163_R02a_Ecological Impact Assessment_300125_IH
240913 – Western Bio-Energy Ltd – Sustainability Statement – v2.02 (1)
C24103.TA01.Iss2 – Tyn-y-Caeau, Margam_Transport Assessment.pdf
C24103.TP01.Iss1 – Tyn-y-Caeau, Margam_Travel Plan
Geo-Env Report
Margham HIA 4
REP02-P01 Noise Impact Assessment – Tyn y Caeau Data Centre
Tree Survey V4_FINAL
Tyn-y-Caeau, Margam – Utilities Site Report (Aug 2024)
1044 – FUT – V1 – 00 – DR – Z – X200 – Site Layout, Level Ground
1044 – FUT – V1 – 01 – DR – Z – X210 – Site Layout, Level First
1044 – FUT – V1 – R1 – DR – Z – X260 – Site Layout, Level Roof
1044 – FUT – V1 – R2 – DR – Z – X265 – Site Layout, Level Gantry
1044 – FUT – V1 – ZZ – DR – Z – 0600 – External Fibre, Power and Water Routes Site Wide
1044 – FUT – V1 – ZZ – DR – Z – X100 – Site Wide Layout
1044 – FUT – V1 – ZZ – DR – Z – X150 – Site Wide Layout – Height Strategy
1044 – FUT – V1 – ZZ – DR – Z – X160 – Site Location and Block Plan
1044 – FUT – V1 – ZZ – DR – Z – X300 – Site 3D Views
1044 – FUT – ZZ – ZZ – DR – Z – X400 – Elevations
2335-URB-XX-DR-LA-XX-100-Illustrative_Lanscape_MasterPlan
2335-URB-XX-DR-LA-XX-101_HW GA
2335-URB-XX-DR-LA-XX-102_SW GA
2464_0500_Drainage Layout
2464_0600_External Works Layout
2464_0760_Swept Path Analysis
ACAD-TYN-Y-CAEAU-MARGAM-R1 – PAS128 Utility Survey (1 of 2)
ACAD-TYN-Y-CAEAU-MARGAM-R1 – PAS128 Utility Survey (2 of 2)
CBsite3margamTOPO-Sheet 1 of 2
CBsite3margamTOPO-Sheet 2 of 2
2335_250130_GI Statement_Margam.vf
Draft Application Form
2336 – Data Centre, Margam – Existing Site Plan

Ready to work together?

We are more than happy to discuss any project, any size, at any time.